Federal Aid Routes

PID 111564 - East 28th St. Rehabilitation (SR57- Grove Ave. to Tacoma Ave.)

Project Information:

Contractor: To Be Determined

Project Manager: Veronica A Newsome

Cost: $1,125,000.00 

Proposed Construction Start, date:06/01/2022

Scope: The intent of this project is to remove and replace the existing concrete roadway from back of curb to back of curb, approximately 27.3 feet. Excavation would be performed and a new stone base added. Deterioration due to heavy truck loads.

Public Comment Period: January 29th, 2021 till February 28, 2021.

Public Comment Information

PID 111556 - East 36th St. Rehabilitation (Globe Ave. to Grove Ave.)

Project Information:

Contractor: To Be Determined

Project Manager: Veronica A Newsome

Cost: $575,000.00

Proposed Construction Start, date: To Be Determined 

Scope: The intent of this project was to mill and fill the existing 22 foot roadway, complete major roadway rehabilitation via base repairs estimated at 25% to ensure a solid roadway base and sub base. During the preliminary study cores were taken and a geotechnical review completed. Further study must occur, including a feasibility study.


PID 111587 - LOR-CR202-0.00 (Broadway Resurfacing)

Project Information:

Contractor: To Be Determined

Project Manager: Shaun Duffala - Lorain County Engineering Office - sduffala@loraincounty.us

Cost: $2,663,680.00

Proposed Construction Start, date: 04/01/2022

Scope: resurface and perform base repair on the worn pavement of Broadway from SR2 to East 28th Street (SR57). Other work will include spot curb replacement, and curb ramp preplacement to meet current ADA standards. Water main under Broadway will be replaced within Lorain County's portion of the project (Cooper Foster Park Rd. to W. 39th St.) at 100% Lorain County Cost.