Lighthouse

City of Lorain Utilities Projects

The City of Lorain has applied for, or intends to apply for funding, for the following planning, design, and construction projects from the Ohio EPA Water Pollution Control Loan Fund (WPCLF) and the Water Supply Revolving Loan Account (WSRLA). Ohio EPA will administer loan preparation based on state standards and Ohio EPA procedures. The currently programmed user rates will not change due to these projects.

If you care to comment on the South Lorain Waterline Replacement Phase III project, anticipated to begin in March 2018, please use the below link to do so. Please submit written comments only to Georgene Gedling at georgene_gedling@cityoflorain.org or at City of Lorain Engineering Department, 200 West Erie Avenue 4th Floor, Lorain, Ohio 44052.Comments must be received by September 15, 2017.

Water Projects:

South Lorain Waterline Replacement Phase III (Construction)

Water Treatment Plan Planning Study (Planning)

Redhill Transmission Main (Design)

Wastewater Projects:

Black River Wastewater Treatment Plant - Travelling Bar Screen Addition (Construction)

Martin's Run Pump Station Upgrades (Design)

The City will provide for public comment on the remaining projects at a later date. At a later date, the Ohio EPA will make available for public information environmental review documents for these projects.
Thank you for your cooperation.

For further information, please contact Georgene Gedling via the above methods.